| 应用: 可注滴的液体包括快干胶,红胶,厌氧胶,黑胶,硅胶,SMT红胶,黄胶,银胶,矽胶,环氧树脂,螺丝锁紧胶,润滑油,助焊剂 .适用的产品主要有:手机按键印花、开关、连接器、电脑、数码产品、数码相机、MP3 、MP4 、电子玩具、喇叭、蜂鸣器、电子元器件等产品的生产
用途: 粘接、固定、点形涂布、线形涂布等
|
入电压
|
108A半自动定时定量点胶机
AC110 ∽ 220V (可自动转换为110V或220V)
|
|
内电压
|
24VDC
|
|
消耗电力
|
9VA
|
|
输入气压
|
最大0.99MPa、无湿气干风
|
|
气压调节范围
|
20---650KPa
|
|
放吐时间范围
|
0.02--99.99sec
|
|
动作模式
|
定时操作模式
|
|
连续操作模式
|
|
放吐开始信号
|
以脚踏开关等无电压N.O.输入
|
|
保持输入信号(信号长>1ms)
|
|
发出的间隔为30ms
|
|
真空机能
|
内置有负压产生装置,防止材料滴漏
|
|
消音机能
|
外置有消音装置
|
|
使用温度
|
+50°C到-40°C
|
|
外形尺寸
|
264*150*68mm(机身)
|
|
重量
|
2.2kg
|
|
标准配件
|
电源线 1PCS
|
|
进气管 1PCS
|
|
脚踏开关 1PCS
|
|
针筒架 1PCS
|
详细信息请来电咨询13092650077 |
|
|
|
| 产品规格︰ | Getting Started We have organized this Guide to provide setup and testing procedures for the CB108B原 200B andCB208B原500B dispensers. If you have the CB108B原200B, CB208B原500B first review following pages which illustrate how tohook up the dispenser and what the controls do.
First Steps First Step: Unpack and use the checklist enclosed with the Dispenser Kit to identify all items. If there is any discrepancy, please call us immediately.
Second Step: Power and compressed plant air should be available where the dispenser is to be set up. Air pressure should be between 80 and 100 psi (5.5 to 6.9 bar). (Bottled nitrogen be used will be better.) If you are not using an air filter regulator ,be certain your plant air is properly filtered and dry. Check voltage label to be certain it agrees with the available power.
Third Step: Now is a good time to ACTIVATE your extended Three Year No-fault Warranty. Please fill in and return the postage-paid Warranty card, Or, if you prefer, call the appropriate toll-free number listed below, provide the serial number of your dispenser and respond to a few short questions.
CB108B原200B & CB208B原500B ---- Hookup 1 Connect the air input hose to a plant air source. Set plant air supply within 80 to 100 psi (5.5 to 6.9 bar ). Where required, use an filter regulator
2 Attach the air input hose coupling to the dispenser . Pull back to confirm if attach tightly to dispenser.
3Plug in the foot switch connector to the dispenser
4 Install the power cord. Check the voltage label on the input voltage outlet and place the power cord into the “power 220VAC” ensure that both sides securely into position.
5 Attach the 55cc barrel pre-filled with colored , nontoxic test fluid (included with the dispenser ) to the 55cc adapter head .
6 The 55cc adapter assembly . insert the male tube into the air output fitting on the front panel and try to pull back to confirm if be locked tightly. Place the barrel in the barrel stand .
7 During the initial testing , you will not use the vacuum control .Keep This control shut off (turned completely clockwise----do not force). And the back of the dispenser shouldn’t be heard any flowing noises
CB108B原200B & CB208B原500B for Testing Power switch should be off.
The amount of material dispensed each cycle depends on the combination of air pressure, time of air pulse, viscosity of material and dispensing tip size.
The first step is to remove the tip cap from the pre-filled barrel of colored test material (twist and pull). Replace it with an tapered dispensing tip. Press the tip on and twist clockwise to lock.
Pull out air pressure regulator knob until it “clicks” into the unlocked position. Turn clockwise to adjust the air pressure to 30 psi (2.1 bar ) for the initial tests.
Always set the pressure desired by turning the air regulator knob clockwise. To reduce the pressure, turn the knob counterclockwise until the air gauge reads a lower pressure than desired. Then increase and stop at desired pressure. Push knob in to lock.
Set the timer control code to “06”.and test it. It is also allowed to test the Dispense cycle time increases from0. 1 second minimum to 9.9 second as the timer code you set. Be sure vacuum control is shut off. In the initial tests, (the vacuum pressure will indicate zero pressure. You may notice the needle on this gauge (when turned off) will jump slightly after each cycle. This is normal for CB308B原800 Dispenser).
Press power switch to turn on the dispenser . It will be a flashing red light. That indicates the dispenser working properly
In this operation mode, the timer will be by passed to fill the dispensing tip before you begin testing . A continuous flow of material will occur as long as the foot pedal pressed.
How the CB108B原200B & CB208B原500B Dispensers Work With the air connected and the power on, here’s what happens when you press the foot pedal.
(1) The digital timer is energized and begins dispense cycle countdown. The LED lights during the dispense cycle. (2) The timer opens a solenoid and closes the vacuum pressure for the CB108B原200B & CB308B原500B, allowing preset air pressure to flow to the barrel reservoir.
(3) The air pressure pushes the liquid out the dispensing tip.
(4) At the end of the preset time , the timer shuts off, closing the solenoid and exhausting the air in the barrel.
This completes the pulse cycle. When the toggle switch point to “Manual” the timer is electrically by pass , and the solenoid is controlled directly by the foot switch As long as the foot switch is pressed , the solenoid remains open, providing a steady flow of liquid for filling till the delay time of the timer code you set is over after you loose the foot switch
|
|
|
|